
.H 1 "Reliability (Jeff Elison)"

.H 2 "Goals"
.nf

a) 24 hour reliability
b) 48 hour reliability
c) 120 hour reliability
d) Maintain a log of failures/crashes

.fi
.H 2 "Basic Test Configuration"
.nf

a) 24 hour reliability configuration:
             ________                  ________
            |        | -------------> |        |
            |  9K    |                |  9K    |
            |        | <------------- |        |
             --------                  --------

b) 48 hour reliability configuration:
          ________                ________                ________
         |        | -----------> |        | -----------> |        |
         |  9K    |              |  9K    |              |  9K    |
         |        | <----------- |        | <----------- |        |
          --------                --------                --------

b) 120 hour reliability configuration:
          ________                ________                ________
         |        | -----------> |        | -----------> |        |
         |  9K    |              |  9K    |              |  9K    |
         |        | <----------- |        | <----------- |        |
          --------                --------                --------
.fi

.H 2 "Vital Statistics"
.nf

RESPONSIBLE ENGINEER: Jeff Elison
PERFORM TIME:   45.0  md
a)  24 hour - 20 md
b)  48 hour - 10 md
c) 120 hour - 15 md
TYPE OF TESTS: quick regression, functional tests, stress tests, and
               special cases
EXPECTED OUTPUT: no failed messages in ...scaf/RESULTS/<resultsfile>

.fi
.H 2 "Development Strategy"
.nf

a) 24 hour reliability
Phase I: Quick Regression Suite  5md
Phase II: Stress Suite subset    5md
Phase III: Functionality Suite   5md
Phase IV: all of the above       5md

b) 48 hour reliability               10md
Quick Regression, Functionality, Stress subset, and special cases

c) 120 hour reliability              15md
Quick Regression, Functionality, Stress subset, and special cases
.fi
