.H 1 "Topology/Gateway Testing (Steve Booth)"

HP's series 9K NFS code will be certified through 2 gateways
and a bridge: a SUN workstation, a series 9K workstation, and
the McBridge (bridge) box from Roseville Networks Division (RND).
NFS operation through a gateway/bridge will be fully
certified only after testing fails to find defects in the code.

.DS
ASSUMPTIONS: YP tests exist in a separate subdirectory under
               the nfs subdirectory; defects associated with
               a local (same LAN) YP server have been found
               and fixed.
             The 'ypset' command will be available to execute
               the YP functional tests through a gateway.
             The 9K gateway code has previously been tested
               and certified w/out NFS interactions
ISSUES:      responsibility for testing the following
               configurations:

 _______            ______            _______ 
|       |          |      |          |       |
|  PC   | -------> | Gway | -------> |  9K   |
|       |          |      |          |       |
 -------            ------            ------- 
 _______            ______            _______ 
|       |          |      |          |       |
|  9K   | -------> | Gway | -------> |  VAX  |
|       |          |      |          |       |
 -------            ------            ------- 

.DE

Gateway/bridge testing will consist of running the quick regression,
functional, and stress tests between two nodes communicating through
a gateway/bridge.  The two nodes will not necessarily be on different
physical LAN cables.

A list of any defects found in HP's competitors' code will be maintained
and given to marketing at the end of the project.

.H 2  "SUN Gateway Tests"

RESPONSIBLE ENGINEER: Jason Zions

Since the majority of LAN gateways (in the NFS marketplace) are SUN
workstations, the majority of gateway testing will be with the SUN.

.sp 2
.H 3 "quick regression"
.sp 1

Run continuous 12-hour repetitions of the quick regression tests until
they fail to isolate defects. 

.DS
 _______            _______            _______ 
|       |          |       |          |       |
|  9K   | -------> |  SUN  | -------> |  9K   |
|       |          |       |          |       |
 -------            -------            ------- 

PERFORM TIME:    3.0  md
.DE

.sp 2
.H 3 "functional and stress tests"
.sp 1

Run continuous 12-hour repetitions of the functional and stress tests until
they fail to isolate defects. 

.DS
 _______            _______            _______ 
|       | -------> |       | -------> |       |
|  9K   |          |  SUN  |          |  9K   |
|       | <------- |       | <------- |       |
 -------            -------            ------- 

PERFORM TIME:    4.0  md
.DE

.H 2  "9K Gateway Tests"

.DS
RESPONSIBLE ENGINEER: Steve Booth
ASSUMPTIONS:  SUN gateway testing already in progress; most
                gateway-related defects already isolated and
                fixed
              9K gateway code already tested w/out NFS
.DE

The intent is to isolate NFS defects, NOT 9K gateway defects.

.sp 2
.H 3 "functional and stress tests"
.sp 1

Run the functional and stress tests overnight
until all defects (found by the testing) are resolved.

.DS
 _______            _______            _______ 
|       |          |       |          |       |
|  9K   | -------> |  9K   | -------> |  SUN  |
|       |          |       |          |       |
 -------            -------            ------- 

PERFORM TIME:    1.0  md

.DE
.sp
.DS
 _______            _______            _______ 
|       |          |       |          |       |
|  SUN  | -------> |  9K   | -------> |  9K   |
|       |          |       |          |       |
 -------            -------            ------- 

PERFORM TIME:    1.0  md
.DE
.sp
.DS
 _______            _______            _______ 
|       | -------> |       | -------> |       |
|  9K   |          |  9K   |          |  9K   |
|       | <------- |       | <------- |       |
 -------            -------            ------- 

PERFORM TIME:    2.0  md
.DE

.H 2  "McBridge Tests"

.DS
RESPONSIBLE ENGINEER: Steve Booth
DEPENDENCIES: McBridge box available by mid-April
ASSUMPTIONS:  SUN and 9K  gateway testing already in progress;
              most gateway-related defects already isolated
                and fixed
              McBridge box already tested and working
.DE

It is anticipated that NFS testing via McBridge will be done
in late April.

.sp 2
.H 3 "functional and stress tests"
.sp 1

Run the functional and stress tests overnight
until all defects (found by the testing) are resolved.

.DS
 _______            _______            _______ 
|       |          |       |          |       |
|  9K   | -------> |  McB  | -------> |  9K   |
|       |          |       |          |       |
 -------            -------            ------- 

PERFORM TIME:    1.0  md
.DE
.sp
.DS
 _______            _______            _______ 
|       |          |       |          |       |
|  SUN  | -------> |  McB  | -------> |  9K   |
|       |          |       |          |       |
 -------            -------            ------- 

PERFORM TIME:    1.0  md
.DE
.sp
.DS
 _______            _______            _______ 
|       | -------> |       | -------> |       |
|  9K   |          |  McB  |          |  9K   |
|       | <------- |       | <------- |       |
 -------            -------            ------- 

PERFORM TIME:    2.0  md
.DE