# This is my schedule for the work on NFS on the s800.
# Under overhead (which does not need to be tracked) are listed:
# 	. technical consulting for Tech. support and Marketing
#	. TWG involvement based on reading notes, posting replies and 
#	  keeping track of proposals that affect us
#	. project documents maintenance
#	  	. concerns lists, agendas
#	. group and program team meetings
#	. monthly project and objectives, weekly objectives
#	. Coordinate with partners since it is mainly based on interrupts
#
# 0.1 = 48 min
# 0.2 = 1h 36 min
# 0.3 = 2h 24 min
# 0.4 = 3h 12 min
# 0.5 = 4h
# 0.6 = 4h 48 min
# 0.7 = 5h 36 min
# 0.8 = 6h 24 min
# 0.9 = 7h 12 min

NAME: Cristina Mahon

Time   Time    Orig.    Category	Task Description
spent  left    Est.

2	0	0	Oth		System Administration Conference
					in Palo Alto

0.1	0	0	Oth		NFS tutorial wrap-up

2.0	0	0	Sup		3.0 NFS and program involvement:
					. Lifecycle
					. Issues: performance for 3.0
					. Testplan
					. Integration cycles
						. filesets for AXE

0.3	0	0	Sup		SSIT 6.2 meeting

2.1	0	0	Dev		Specific development work:
					(counts for 3.0)
					. Reproduce defects in Sun list on
					  s800
					. Fix any new defects:
						. rstatxdr
						. rpc.mountd
						. rstat.h
					. Investigate possible defects
						. ypserv power-failure
						. XTTC YP problem
					. VHE (testplan)
					. Long filenames and NLS changes
					  for 6.2/3.0 time frame.
					. Provide NLS information to the
					  whole group.
					. Prepare single revision level for
					  libc and header files for 6.2 and
					  3.0.
					TO DO:
					. BFA report

0.6	0	0	Sup		4.0 Preparation	
					. PDS
					. Staffing
					. Requirements Complete deliverables

4	0	2	Sup		Wrap-up tasks and ongoing project 
					work for 2.0
					. Modified how-to document, ERS,
					  NLS cookbook, lifecycle
					. Made archive tape: copy it and
					  verify it.
					. Project Notebook: two copies
					. Maintain defects lists
					. QA metrics (corporate, CND)
					. STARS: enter defects
					. MR meeting (dry run, preparation,
					  attendance)
					. Update hpcndau to latest code
					. 2.0 TQC meeting
					. Turn tape with tests to manufacturing
					TO DO:
					. Finish project notebooks
					. Update 2.0 lifecycle
					. Finish TQC report

1.0	0 	0	Sup		Section I shared source
					. We still need to setup a build
					  on hpcndhf (next month?)

0.9	0	0	Sup		NFS tutorial for Sys Adm Conference

0.4	0	0	Doc		Review VHE documentation
					(6.2 but applies to 3.0)

0.5	0	0	Sup		Spread development env. info:
					. Help Peking with setting up
					  DE and explained it to whole group
					. Discussed DE with Steve Booth
					. Discussed DE

0.3	0	0	Sup		Review 6.0 TQC results to make
					sure we are folowing the 
					recommendations

0.4	0	0.5	Sup		Ongoing development environment
					work
					. Helped Mark admin some files
					. RCS testplan for Toni
					. Setup dev. env. for Toni

2.2	0	0	Sup		SCCS to RCS conversion

0.1	0	0	Oth		Information for ranking

0.1	0	0	Oth		Talk to Meena about porting
					documenting ported code

0.1	0	0	Test		PC-NFS and PAM problems:
					. Find someone to talk to Geoff Arnold
					  of Sun

0.1	0	0	Oth		Helped Doug Gregory with a xdb/cc
					problem on the s800

0.1	0	0	Sup		NFS/800 monthly report

# Overhead included 6 and 1/2 hours of meetings (lab meeting, group meetings,
# program meetings).
=============================================================================
Checkpoint	MR	02/29/88	Manufacturing Release
=============================================================================

=============================================================================
# Checkpoint	IntIntg	06/15/87	Initial Integration
=============================================================================

6.3	0	10	Sup		Setup development environment for
					800 commands work. 
					. Preliminary changes to build to
					  match 800 IC build environment.
					. Still need to make the more 
					  substantial changes when we receive
					  the preliminary paper describing
					  process.

0.2	0	0	Sup		Descriptions for the 800 processes
					and contract information.

4.7	0	5	Sup		Lifecycle dependencies, deliverables, 
					checkpoints; effort estimates
					. lifecycle updates
					. tasks for the 800 (estimates): meeting
					  and time spent thinking about them
					. agenda sent for group meeting concerns
					. still need to come up with full list
					  of 800 dev. tasks.

1.6	0	0	Test		Gather data for NFS/800 performance 
					brief

0.7	0	5	Sup		Working with Darren on initial setup
					of kernel source code sharing	
					. Helping Darren with kernel shared 
					  source (explain tools I got at ISO,
					  compile rmtrcs)

4	0	15	Dev		Port NFS commands to 800
					. fsirand is only command left because
					  it relies on kernel include files.

0.6	0	0	Coord		Ongoing coordination and status
					checking with ISO.  Should I list this?
					. found about status of DTS, kernel,
					  commands.  Get 800 kernel over.

0.4	0	0			Overhead
					. Time spent rebuilding commands and
					  getting the kernel from ISO

0.1	0	0	Sup		ERS changes 

0.8	0	3	Iss		Product structure issues:
					. link level dependencies:
					  Inetd will be on link product.

2.6	0	0	Sup		Trip to ISO mainly to discuss
					processes and arrangements between
					groups and setup test suite at ISO.
					. the trip lasted two days
					. this time includes arrangements
					  before the trip and writing the trip
					  report.

1	0	1	FTO		Vacation

2	0	2	Train		Team Building for Non-Managers

=============================================================================
#Checkpoint	IC1	08/19/87	Full Functional Complete (IC1)
=============================================================================

3.5	0	0	Iss		Product structure issues:
					. Checked on status of routines at
					  SSO and ISO
					. Helped Gayle fix scripts for transfer
					  of routines between CND and SSO
					. Talked with all parties involved
					  about the location of the bsdipc 
					  routines (we have decided which
					  and where the shared ones will go)
					. Talked to Donn Terry about
					  his group serving as an intermediary
					  between CND and ISO for the libc
					  routines (agreed on).
					. Maintained IND integration group	
					  up to date on situation.
					. Investigated where to start inetd
					  for both s300 and s800 with David
					  Haimson.  It looks like netlinkrc is
					  the best place.  However, 800 
					  netlinkrc does not have any of the
					  product files on it.  They are added
					  by the user.
					. Reviewed customize script from Steve
					  Hares for the 800.  Made changes to it
					. Talked to Brian Buyan about how to
					  find out if filesystem supports long
					  filenames.  We will read the 
					  superblock.

0.3	0	0	Sup		Talked to Warren and Walter Underwood
					about the problems we have been seeing
					with the Internet.  Talked to Dan
					about it yesterday.  It would be good
					if we could raise the priority of 
					looking at this problem for Warren.

5.4	0	20	Dev/Test	Major bug fixes after initial porting
					. Tracking ypcat core dump
					. General problems with YP and hpcndau
					. Run lint through the files to fix
					  variables used before initialized.
					  Reason for core dumps with -O
					  option.
					. Looked at svc bug, have not been able
					  to track it down yet.
					. Resolved rpc.yppasswdd bug with Dave.
					. Looked at several bugs including
					  two from the XTTC that turned out
					  to be operator errors (old inetd.conf
					  with new inetd, wrong parameter
					  to client_call).

10.1	0	0	Sup		Integration cycles/partner deliveries/
					development environment for 800
					. Re-submit because of Makefile problems
					. Add a makefile at the front of normal
					  Makefile to compile inetd.
					. Fix up_release tool to do what we
					  need.
					. Header file delivery problem:
					  who will deliver header files to 
					  integration group.  This has
					  been resolved.
					. Builds/tars/deliveries of commands 
					  for partners 
					. Changes to Makefiles to match
					  integration format (test also) 
					. Create master database and 
					  documentation of what is delivered
					. Delivered test base build
					. Got 800 tools for the 2.0 release:
					  we will have to test the compiler
					  to see if it still has the -O problem
					. Added what strings for man pages.
					. Changed what strings for libraries
					  and header files.
					. Made sure customize script will be
					  submitted to me by Steve Head for
					  submission to the integration group.
					. Looked through the integration tools
					. Changed some of our Makefiles.
					. Delivered tar files to partners.

1	0	1	Train		HP-PA class

1.2	0	4	Sup		Mentoring Mark Kean
					. Explained Makefile set up for 800.
					. Showed him integration process
					. Answered Makefiles and bfa questions

5	0	0	Sup		Lifecycle dependencies, deliverables, 
					checkpoints; effort estimates
					. Added actual completion dates for
					  several tasks.

0.3	0	0	Sup		Answered questions Chuck Untulis had
					about the development environment and
					talked to Scott Engles about it so
					that they can use some of the concepts
					on their dev. env.

0.1	0	0	Doc		Clarified some documentation comments
					and got some more information for 
					Annette.

0.3	0	0	Train		Went to the pay system class

0.3	0	0	Metr		Looked at some of the metrics
					required.
					. Filled the metrics form and
					  send it to Brian Sakai even though
					  we officially didn't need to submit it
					. Talked to him about all the fields
					  in the form and what they meant.
					. Developed script to produce a list
					  of bugs and serve as input to future
					  metrics script.

1.1	0	0	Coord		Ongoing coordination and status
					checking with ISO.  Should I list this?
					. Arrange for missing HP-UX commands 
					  to get here
					. Followed up on the DTS process
					. Checked if DTS project available here
					  and talked to Tim Remple about it.
					. Mailed documentation that ITG lost to
					  them again.

0.1	0	0	Dev		Helped SPL check results they obtained
					and send them the Turbo Lan cards.

0.2	0	0	Doc		Reviewed 6.0 Arpa/Berkeley 
					documentation for NFS differences.

0.2	0	0	Doc		Reviewed 2.0 documentation structure
				 	for changes because of inetd in link
					product.

0.2	0	0	Dev/Test	Problems that affect the testing and
					development:
					. Got new C compiler from Randy Barbano.
					  It still has problems with -O option.
					. We still have problems with the 
					  Internet.  They could be caused by
					  our gateway.  Warren is looking
					  into it.

0.2	0	0.5	Tech		Review tech support class

0.5	0	0.5	Doc		Review man pages for differences
					between 300 and 800

0.6	0	0	Sup		Helped the SPL with our tests and
					NFS information in general

0.2	0	0	Dev		Code review and discussion for inetd
					changes.

6	0	15	Dev		Port NFS commands to 800
					(more like ongoing development)
					. ported and tested fsirand
					. changed what strings to match 2.0
					  convention
					. cleaned up header files
					. changes to YP to support long
					  filenames

0.5	0	0	Sup		Descriptions for the 800 processes
					and contract information.
					. Wrote this up, mailed it.
					. Will merge comments back as they
					  arrive.

0.7	0	0	Sup		Working with Darren on initial setup
					of kernel source code sharing	

2.4	0	0	Test		Gather data for NFS/800 performance 
					. Ran tests first on the CND test LAN
					  and then on an isolated LAN
					. Wrote a report on the results and
					  distributed it.  
					. Explained the tests to Andy Drol.
=============================================================================
#Checkpoint	IC2A	09/07/87	Level A - 24 hour reliability (by IC2B)
=============================================================================

# Some of the overhead since the last meeting included the voice mail training,
# the 2.0 update meeting, helping SPL with performance measurements and
# general NFS 800 meetings and teleconferences.

0.1	0	0.1	Supp		Find solution to Internet problem

1.3	0	2	Doc		Review third documentation draft 
					(2nd for 800)

0.8	0	1	Metr		Gather breadth coverage metrics
					and create scripts to help in metrics
					collection
					. Mainly time spent on understanding
					  and collecting the breadth coverage
					  numbers.  I still need to update
					  some of the scripts I have to perform
					  extra work for the DTS metrics 
					  required.

9	0	10	Dev/Test	Continuing bug fixes
					. Small NLS fixes and changes to certain
					  routines.
					. Many bug fixes including alignment 
					  problems on the 800.
					. Code review of xdr_rec.
					. Because we just got a system
					  with long filename support setup
					  I still need to implement long file 
					  name support on YP commands.
					  I have a set of routines that should 
					  do the work. 

0.2	0	2	Doc		Provide Annette with information on
					300/800 differences (Sept. 1)

0.3	0	1	Sup		Help Mark Kean with the Integration
					process so that he come up to speed
					on it.
					. He will be missing the hands-on
					  training on how to change the 
					  revision levels for a final
					  build since he is in class today.

2.2	0	2	Sup		Integration work:
					. Fixing what strings for IC2
					. Verifying that the correct version
					  of routines and header files were
					  being used for IC2 base build
					  (including netlinkrc)
					. Changing makefiles to fix problems
					  that happened during IC1.
					. Fixing master database of files we
					  submit.
					. Submitting files for IC2 base build

0.3	0	0	Sup		Sharing code with Smelter:
					. inetd and A/B routines.  Discussed
					  with John and David system to
					  share that code.  John has 
					  implemented this system.

1	0	1	FTO		FTO

=============================================================================
#Checkpoint	IC3A	10/19/87	Level B - 48 hour reliability (by IC3B)
=============================================================================

7.8	0	10	Dev/Test	Continuing bug fixes
					. Investigated defects in rup, rusersd,
					  innetgr, rpc.mountd and others
					. Added support for long filenames
					  in ypxfr and ypsrv.
					. Investigated XTTC problems with
					  inetd/portmap.
					. Made all changes that need to be
					  made to fix outstanding bugs in
					  separate versions of the code so
					  we can put them in as fast as 
					  possible after we unfreeze.

2.5	0	0 	Dev		Work on the 300
					. Helped track an ftp problem that 
					  showed up if we had a + in the
					  passwd file.  However, the defect
					  turned out to be an stdio problem
					  brought about by a wrong call in
					  ftp.
					. Did a lot of work on the validation
					  suite, both setting it up and 
					  looking at the results (0.7 days)
					. Found out about whether libc had to
					  turn or not.
					. Helped John roll the command levels 
					  for the s300 6.0 release. 
					. Talked to Holly about delivering our
					  man pages for typesetting.
					. Check if the revision levels and the
					  tags were correct for libc for
					  s300.
					. Produced list of all NFS message
					  catalogs to give to Dave, John and
					  Mark as soon as I know if there is
					  a specific format for the final
					  document.

1.5	0	0	Sup		Minor integration work left
					between IC2 base and final build
					. Need to help John with rolling
					  revision levels
					. I will help Mark with the IC3
					  release if he has any questions
					  about it.
					. Changes to database for new 
					  permissions for some YP commands
					. Talked to Randy about having backup
					  tapes sent to us (still in the air)
					. Mainly did things that Mark would
					  have done if he was here
					. Check revision levels for IC3 code
					  that we sent to integration.

0.7	0	2	Iss		Any issues that might come up.
					. Discussed code sharing with John, 
					  David Haimson and Barb Hein
					. Looked at 825 performance (general
					  information available from Smelter)
					. Performance meeting: what numbers
					  do SE's need.
					. Verified if open reservation was 
					  going to be the default (IC3)
					. Product tape for 800 2.0 release
					  (how is it done)
					. 3.0 certification criteria
					. Disc space required for NFS 800 user
					  level commands for Andy Drol.

0.3	0	0	Sup		Worked on a proposal for a new way
					to do code sharing.

1.9	0	3	Dev		Redoing message catalogs and 
					investigation of future improvements

0.7	0	0.2	Metr		Modify scripts I currently have to
					give more information for the DTS 
					based metrics.

0.2	0	0	Sup		Updated lifecycle and ERS to reflect
					some changes

0.2	0	0	Sup		Metrics for IC2
					. I feel I probably should keep doing
					  the metrics part of the reporting
					  while Mark handles integration

0.2	0	1	Doc		Documentation review and consulting
					. Had only to review the final draft
					  of programming with NFS quickly
					  for 300/800 differences.

1.7	0	0	Over		The overhead this month included
					several group meetings (300/800),
					teleconferences, program meeting,
					communication session with Art and
					my evaluation.
=============================================================================
#Checkpoint	IC4A	11/23/87	Level C - 120 hour reliability (by IC4B)
=============================================================================

6.8	0	5	Test		Write more tests to bring the BFA
					coverage to 60% or above.
					. Left to do:
					    . Put tests on scaffold
					    . Get coverage to 75%
					. Did some interactive testing to bring
					  coverage up.
					  (65.4% + 11h30mn = 68.9%)
					  (68.9% + 3h30 mn = 69.5%)
					  (69.5% + 2h	   = 70.45%)
					  (70.45% + 2h	   = 70.7%)
					  (70.7% + 2h	   = 72%)
					  (72%   + 3h30	   = 72.9%)
					  (72.9% + 1h30	   = 73%)
					  ( 73% + 6h	   = 73%)
					. Help Mark with some of the Makefiles
					  for the 800.
					. Fix BFA build problems
					. Started putting tests in scaffold.

2.9	0	0	Test/Sup	Work on the s300:
					. Wrote NLS cookbook.
					. Gathered some of the metrics for
					  Corporate.
					. Checked tags for libc and header 
					  files.
					. TQC on NFS 300 project
					. README file for doc directory
					. Examine results of validation suite.
					  Found one real defect and a lot of 
					  environment and test problems.
					  Also found out that the SCCS commands
					  were compiled with the wrong library
					  and would not work over NFS at all.
					. Tracked down format of NLS message
					  description.
					. Helped Mikey with the NFS/300 metrics
					. Setup procedure to rebuild 6.0
					  NFS if necessary.
		

1.5	0	5	Dev/Test	Fixing defects and development:
					. Fixed defect in gettransient found
					  during minimal code read.
					. Investigated a defect related
					  to removing mount points when
					  something is mounted (300 and 800
					  problem).  Forwarded DTS to correct
					  group.
					. Fixed wrong error message.
					. Looked at John's fixes for
					  rpc.rusersd.
					. Checked strange showmount problem 
					  (old showmount found in wrong 
					   location) and other interesting
					  things (NFS and sym links, etc.).
					. Fixed pmap_rmtcall timeout problem.
					. Read John's RPC IMS and provided
					  comments.
					. Investigated test problem and 
					  portmap problem (was a kernel 
					  problem)

0.9	0	0.5	Sup		Shared code:
					. Left to do:
					   . Writeup about shared source
					     directory structure.

					. Folded in the comments from John, 
					  Barb and David to the shared code 
					  document.  
					. Presented it with John to Jeff.
					. Reviewed requirements to be
					  part of shared source (Makefile
					  targets, etc.)

1.9	0	3	Doc		Documentation review (installation,
					etc.)
					. Ran an RPC program to get results
					  for the 840 for a table in the
					  programming guide.  The results
					  were so bad compared to the 300
					  that I did not run the program on
					  the 825.  If it does not improve the
					  table might be removed.
					. Reviewed 6.0 man pages for 800 
					  changes and made some changes
					  that Mark and I discussed.
					. Review installation part of the
					  documentation.

0.7	0	0.5	Test		Installation testing:
					. Helped Toni try to install 2.0
					  on an 825.
					. Once the installation was complete
					  reviewed problems with the 
					  documentation and checked permissions
					  of NFS files (specially header files)

0.6	0	1	Metr		Metrics required for this integration
					cycle.
					. Explained ssize to Mike Clinger from
					  the PTT.
					. Refined the scripts even more so 
					  that the metrics gatering itself
					  for each cycle will require less time
					. Defects per line of code per module
					  metric (to use in conjunction with 
					  BFA).

0.4	0	2	Iss		Any issues that might come up
					. NFS certification criteria
					  for 3.0 had not been mailed
					  to Brian Sakai.  I made sure that
					  NFS should be covered by the 
					  products with no changes rule.
					  Follow up on that.
	
0.4	0	0	Sup		Development environment for NFS 800:
					. Showed Mark how to change some 
					  directory structures on the 
					  development environment and changed
					  scripts to match that.
					. Put new assembler in place for
					  the NFS 800 compiles.
					. Added a process to make BFA commands
					  for the 800 to the overnight process.
					. Fixed up_release to be more reliable

1.4	0	0.1	Sup		Integration:
					. Track down problem with Internet
					  connectivity with ISO/IND from
					  dk/du.  That caused problems 
					  checking in the header files and
					  explains a larger amount of the time
					  spent.
					. Helped Mark solve a problem with a
					  build not working at ISO:
					  it turned out to be that a file
					  provided by the commands group was
					  wrong.
					. Make a tar tape with the ERS for
					  ITG archival purposes.
					. Showed Mark Kean how to change 
					  revision levels for IC3B.
					. Checked problem with ypmake that
					  Greg Smith had.
					. Verified the correct library 
					  routines were available for IC3B.
					. Got new version of customize

0.1	0	0	Sup		Talked to Mike Robinson about how we
					estimated how long it would take us 
					to port/debug the NFS user level code.

0.1	0	0	Oth		TQC on interview process

0.4	0	0.5     Doc		Man pages:
					. Changed man pages to say series
					   300 and 800 only, instead of 
					   series 300 only.
					. Added Series 800 dependencies for
					  the long versus short filenames
					  file system and YP.

0.3	0	0	Oth		Since I was waiting for BFA numbers
					before being able to deal with that
					and IC3B has been delayed I started
					reading about NCA and NCS for my
					own information.
=============================================================================
#Checkpoint	IC5A	01/04/88	Level C - 120 hour reliability (IC5)
=============================================================================

4.6	0	5	Test		Increase BFA coverage and
					put tests in scaffold.
					. Put tests in scaffold and in
					  testplan.

3.7	0	2.5	Doc		Documentation review
					. Finished reading first draft and
					  had the documentation meeting.
					. Reviewed Arpa/Berkeley 2.0 man pages
					  for NFS specific parts.
					. Reviewed parts of link/A/B node
					  manager's guide.
					. Reviewed Eric Wilford's comments.
					. Reviewed final draft.
					. Reviewed NS/ARPA/NFS overview doc.

4.4	0	5	Dev/Test	Bug fixes and development:
					. Changes to ypserv and ypmake
					  to handle long filenames better
					. Strange remsh problem
					. 255.255.255.255 problem
					. Inetd.sec/mount through gateway
					  problem.
					. Defects submitted by XTTC:
					  operator errors and wrong
					  error message returned by Sun code.
					. Ypserv/longfilenames defect.
					. Connectivity problem with hpcndax.
					. Getpwent problem.
					. Cleanup code (possible problem with
					  clnt_tcp.c opening 0, 1 or 2).
					. Fix nfsd/biod when system call not
					  available.
					. Review ownership of commands 
					  (nfsstat).
					. Problem with Internet and checking
					  in clnt_tcp.c
					. Nroff testplan problem.

0.5	0	2	Sup		Shared source process for section I.
					. Meeting about equipment required.
					. Wrote about the structure
					  of the shared source.  Being 
					  reviewed.

4	0	4	FTO		Vacation

0.1	0	0	Sup		NFS tutorial at Sys Admin conference.

0.6	0	0	Sup		SCCS to RCS conversion

0.2	0	0	Dev/Sup		NLS:
					. slide for Jim Willits
					. Fixing a catalog problem
					. Adding more messages to catalogs

0.8	0	0.5	Metr		Metrics required for this integration
					cycle:
					. Recovering from plot programs lost						  on hpcndhf.
					. Fixing defect on getmiscdata Pascal
					  program.

1.2	0	1	Sup		Any work left on the s300 that
					I need to do (NLS cookbook, tape, etc.)
					. TQC report
					. How_to document
					. Metrics required for Corporate
					  and QA complete.

0.4	0	0	Sup		Integration problems:
					. hpisoa1 out of memory buffers
					  problem (so change to header
					  files had to be done there).
					. Added chmod's to up_release.
					. Resubmitted because of ypserv
					  problem

0.1	0	0	Sup		NFS 800 development group objectives

# Some of the overhead for this month included coffee talks, teleconferences, 
# MR meeting and group meetings.

=============================================================================
#Checkpoint	IC6A	01/25/88	Final Bits
=============================================================================

2	0	0	Sup		NFS tutorial for Sys Adm conference
					. Clarify facilitator and panel 
					  requirements
					. Write first draft

1.4	0	0	Sup		SCCS to RCS conversion

0.9	0	0	Sup		Other tasks
					. s800 equipment planning for 3.0/4.0
					. Plan NFS NLS requirements in 
					  upcoming releases for the 
					  "Phase 0 Estimates for International
					   Features" document.	
					. Percentage of my time spent on 
					  the 2.1 and 3.0 releases respectively
					. Talked to Danny Lau about NS bfa 
					  waiver.

1.2	0	0	Sup		Other project related tasks:
					. Keeping most wanted defects list
					. Changes to development environment
					  for NFS 3.2
					. BFA report

2.5	0	3.5	Dev		Defect fixes:
					. Fixed spray problem
					. Identified ypserv/libdbm.a abort
					  problem
					. Examined problem that turned out
					  to be a bad routing table
					. Looked at makedbm fix with Mark
					. Checked on Link/NFS testing 
					  planned by XTTC
					. Checked signal sent by abort call
					. Look at PC-NFS problem
					. CRT for ypmake problem

0.1	0	0	Sup		Reviewing the UKL/UDL new shared
					build process proposal as a partner
					This might affect us in the future
					if it changes the requirements for
					integration submissions and affects
					our interaction with the commands
					group (especially from the point
					of view of the central source server)
					I will be talking to Gayle Dilley after
					February 01.

0.4	0	0	Sup		NFS 800 submission
					. Prepare files to be submitted
					. Put metrics in form

1.3	0	1	Doc		Review documentation for final
					sign-off:
					. Reviewed Don Hines documentation
					. Reviewed NFS manuals
					  (reread everything for formatting
					   check)

3	0	3	FTO		Vacation

# Overhead includes group meetings, catching up after vacation, writing
# the NFS/800 monthly report and scheduling teleconferences.

=============================================================================
Checkpoint 	END
=============================================================================