.\"	   @(#)$Revision: 1.11.109.1 $	$Date: 91/11/19 14:31:12 $

.\ Leave the first line of the file blank as the .TL and .AS
.\ macros do not work otherwise.  Don't ask me why.
.ce 2
.sp 4
.TL
PROJECT LIFE CYCLE FOR THE NFS/800 PROGRAM






.ce 4
Mike Shipley
COLORADO NETWORKS DIVISION
1-229-2131 
hpfcla!m_shipley




.AS

This paper started as the project lifecycle
for the PROJECT NERFS.  It then expanded to 
include the efforts by ISO and IND on the Series 800
in addition to the work done by CND on the Series 300.
This program is involved with
putting SUN's Network File System product on the
Series 300 and Series 800.
Now the paper is being split into a part for the 300 and a
part for the 800.  
It will list what needs to
be done and what will be the deliverables from each
functional group at each phase of the program.
In order to have a handle to apply to this program,
the name NERFS will continue to be used.  It will refer to the
NFS program as spanning across multiple divisions.
The NERFS lifecycle will not follow the normal CND lifecycle
as NERFS will be porting existing code from SUN.

In addition to this lifecycle, there are more detailed
lifecycles for the various areas such as technical 
support.

.AE








.ce
Last Modification 01/14/88
.nr P 1
.PH " 'Lifecycle for Program NERFS/800' 'Introduction' "
.bp
.SA 1
.H 1 "Program Identification"
.PF " 'HP Internal Use Only' ' \\\\n(H1-\\\\nP'  "


.nf
     Program Name    : NERFS
.fi

.H 2 "Personnel  (at CND)"
.nf
     Project Manager : Jeff Lindberg
    
     Project Engineers:
         Dave Erickson
         Cristina Mahon
	 Mike Shipley
	 Dan Simula
	 Darren Smith

    Technical Documentation : Annette Parsons

    Product Marketing : Andy Drol

    Technical Support : Carole Crall

    Quality Assurance : Chuck Morse
.fi

.H 2 "Personnel  (at ISO)"
.nf
     Project Manager : Ching-Fa Hwang 
    
     Project Engineers:
         Brian Byun
         Herve DaCosta
	 Vincent Hsieh
	 Chyuan-Shiun Lin

	 Mike Saboff (works in Doug Hartman's group)
.fi

.H 2 "Related Projects "
.nf
.ul 1
    Project Name   Managers       Project Emphasis

    PEKING         Dean Thompson  S/300 Network Convergence
    DUX/300        Joe Cowan      Distributed HP-UX on S/300
    HP-UX 800      Doug Hartman   HP-UX commands on S/800
				  at ISO
    HP-UX 300      Donn Terry     HP-UX commands on S/300

    IND            IND is planned to take over the NFS effort 
		   on S/800 for RPC and networking related
		   aspects of NFS.  This transition will not
		   be described in this document.
.fi



.PH " 'Lifecycle for Program NERFS/800' 'History' "
.bp

.nr P 1
.H 1 "Revision History"
.nf
First Version.....................................September, 1986
Marketing inputs..................................October, 1986
Lab inputs........................................November, 1986
ISO inputs........................................November, 1986
Split into 300 and 800 versions...................January, 1987
.fi



There is an implied review of the documents that will be produced
by this project.  Sometimes reviews will be explicitly mentioned
in the lifecycle.  This was done for the more visible 
documents or to highlight reviews that need to be done between
departments.
.PH " 'Lifecycle for Program NERFS/800' 'Requirements Complete' "
.bp
.nr P 1
.ul 1
.H 1 "Requirements Complete"

.ul 1
R&D - CND
.AL
.LI
Product Requirements Document
.DL
.LI
description of the product
.LI
product objectives, including FURPS
.LI
project requirements
.LI
dependencies/assumptions
.LE

.LI
List of Project issues and answers

.LI
Preliminary Project Data Sheet

.LI
Project Life Cycle

.LI
List of divisional responsibilities and commitments
.DL
.LI
tasks identified and people matched with them
.LE

.LI
Preliminary Schedules
.DL
.LI
checkpoints
.LI
bug chart  
.LE
.LE

.ul 1
Product Marketing - CND
.AL
.LI
Results of customer visits and survey on NFS/RFS

.LI
Preliminary Product Plan
.LE

.ul 1
Documentation - CND
.AL
.LI
Preliminary Documentation Plan
.LE

.ul 1
Technical Support - CND
.AL
.LI
Unique support Requirements   
.LE

.ul 1
Finance - CND
.AL
.LI
Need Internal Rate of Return on NFS
.LE

.PH " 'Lifecycle for Program NERFS/800' 'Connect-a-thon' "
.bp
.nr P 1
.ul 1
.H 1 "Connect-a-thon"
This section is a departure from the CND Lifecycle.  It was
put in as a major checkpoint in our development.
The connect-a-thon is chance to check the connectivity
between the different
NFS vendors in preparation for the UNIFORUM demo.


.ul 1
R&D - ISO
.AL
.LI
Vnode based file system kernel code merged with DUX for the S/800
.LI
Pass the SUN Test Suite for NFS
.DL
.LI
S/800 to SUN/3 machine
.LI
S/800 to S/800
.LI
S/300 to S/800 (working with CND)
.LE
.LI
Obtain preliminary benchmark performance numbers
.LE


.PH " 'Lifecycle for Program NERFS/800' 'Definition Complete' "
.bp
.nr P 1
.ul 1
.H 1 "Definition Complete"

.ul 1
R&D - CND
.AL
.LI
Complete ERS for NERFS
.DL
.LI
all definitional issues resolved including interactions
with DUX and HP-UX
.LI
description of which functions of NFS, NERFS will provide.
This will describe the additions made by 3.2 NFS.
.LI
the ERS will be the reviewed updated man pages from SUN on the portions 
of NFS we are doing plus a document describing any differences
we may have with SUN.  It will also describe any user-visible
changed introduced into HP-UX due to NFS.
This to be done by all of the R&D team.
.LE

.LI
Identify performance benchmarks to be used officially in project
for performance measurement     

.LI
Testing Documents
.DL
.LI
preliminary NFS System test plan
.LI
preliminary NFS Functional test plan
.LE

.LI
Identification of the additional effort it will take to put in
3.2 NFS features into the product.  This will include areas of
producing the functionality, testing the new functionality and
documenting the additions.

.LI
Schedules
.DL
.LI
PERT charts
.LE

.LI
Test Equipment
.DL
.LI
plans complete to obtain additional testing machines access.
.LI
estimates for NTC time/resources needed.
.LE

.LI
Reviews
.DL
.LI
preliminary Product Plan
.LI
preliminary Documentation Plan
.LE

.LI
Actions with TWG   (With help from ISO and SSO)
.DL
.LI
have all HP-UX man pages affected by NFS (this will include existing and new
pages), updated and submitted for
"Request for Comments".  This will be done by posting to hp.unix.tech.
The pages that deal with HP-UX will be sent to the HP-UX TWG.  The pages
that deal with networking will be sent to the Networking TWG(if established).
.LE
.LE

.ul 1
R&D - ISO
.AL
.LI
Project plan for commands affected by NFS completed
.LI
Review ERS for NERFS
.LI
Review NFS test plans
.LE

.ul 1
Product Marketing - CND
.AL
.LI
Trade show plans for Jan 87 (UNIFORUM) complete
.DL
.LI
this needs coordination with CND R&D and ISO R&D/Marketing
.LI
preliminary plans for NFS demo
.LE
.LE


.PH " 'Lifecycle for Program NERFS/800' 'Design Complete' "
.bp
.nr P 1
.ul 1
.H 1 "Design Complete"


.ul 1
R&D - ISO
.AL
.LI
Product Functionality
.DL
.LI
partial(80%) NFS functionality for S/800(as defined in Project ERS)
.LI
have existing commands (mount, sh, etc.) that are affected by
NFS functional
.LI
functional demo on S/800 for UNIFORUM
.LI
compatibility with DUX
.LI
compatibility with ARPA/Berkeley name server
.LI
functional demo on S/800 for UNIFORUM
.LI
compatibility with future RFS (AT&T Sys V) implementation
.LI
self-hosting on S/800 for NFS.
.LI
review of selected portions of the code
.LE

.LI
Installation
.DL
.LI
user installation procedures need to be defined for S/800.
.LE

.LI
Complete IRS for NERFS on S/800
.DL
.LI
design approved by NERFS team (ISO)  
.LI
description how NFS will function in HP-UX.  This will include
interface specifications such as vnode<-->nfs, nfs<-->rpc
and rpc<-->networking.
.LI
description of what files NERFS will add/change in HP-UX
.LE
.LE

.ul 1
R&D - CND
.AL
.LI
Product Functionality
.DL
.LI
functional YP services
.LI
port of PCNFSD code from SUN for PC/NFS
.LE

.LI
Identify what should be done for "mini design complete"
checkpoint for the additions to NERFS because of 3.2 NFS.  We will 
concentrate on the 3.0 NFS for the
major design complete checkpoint.

.LI
Run official performance benchmarks

.LI
Testing Documents
.DL
.LI
completed NFS and YP System test plan (this should include plans
for testing connectivity to other vendors' versions of NFS
and plans for DUX interactions)
.LI
completed NFS and YP Functional test plan; individual module test 
plans
.LE

.LI
Actions with TWG   (With help from ISO and SSO)
.DL
.LI
have all man pages affected by NFS that need approval 
submitted to TWG(with the appropriate pages going to the
Networking and HP-UX TWG's).
.LE

.LI
Build Process
.DL
.LI
process in place for reporting problems and getting fixes with
SSO and ISO
.LI
procedure in place to get current versions of SSO and ISO kernels
.LI
procedure in place of how we will build systems and distribute
releases
.LI
preliminary validation process for new kernels in place for the
S/800
.LE

.LI
Identify metrics to be used for the remainder of the project
for S/800.
.DL
.LI
identify tools/processes needed to gather those metrics
.LI
change in design
.LI
change in code
.LI
outstanding defect count.
.AL a
.LI
What defect reporting system to use?
.LI
decide on consistent definition of data for all fields in
defect tracking system
.LE
.LI
defect rate per testing hour
.LI
defect tracking for SUN defects
.LI
code coverage
.AL a
.LI
PFA on Series 840
.LI
need to decide what code will be measured (XDR/RPC???)
.LE
.LE

.LI
Reviews
.DL
.LI
IRS
.LE
.LE

.ul 1
Product Marketing - CND
.AL
.LI
Final product plan
.LI
Identify who will get our early releases
(Input from R&D and Technical Support)
.DL
.LI
qualify ALPHA and BETA sites
.LI
installation and usage documentation for early releases
.AL a
.LI
brick pages
.LE
.LI
releases
.AL a
.LI
ALPHA sites
.LI
BETA sites
.LI
known business opportunity sites
.LE
.LE

.LE

.ul 1
Technical Documentation - CND
.AL
.LI
Final documentation plans and schedule
.DL
.LI
detailed outline of contents
.LI
manual review process defined
.LE
.LE

.ul 1
Technical Support - CND
.AL
.LI
Preliminary product support strategy and plan
.DL
.LI
BETA site support
.LI
Reviewed by program team
.LE
.LI
Preliminary training plan
.DL
.LI
Reviewed by program team
.LE
.LE

.ul 1
All Departments
.AL
.LI
detailed schedule for program PERT chart.
.LE

.PH " 'Lifecycle for Program NERFS/800' 'Code Complete' "
.bp
.nr P 1
.ul 1
.H 1 "Code Complete"

.ul 1
R&D - ISO
.AL
.LI
Product Functionality
.DL
.LI
Full NFS functionality on S/800 (as defined in ERS), this is
for the kernel code
.LI
All NFS affected commands functional
.LE

.LI
Quality Assurance Testing
.DL
.LI
50% of NFS functional test plan executed (15% completed)
for S/800
.LI
30% of NFS system test plan executed (10% completed)
for S/800
.LI
50% of testing for NFS affected commands executed (15%
completed) for S/800 
.LI
50% code coverage on S/800
.LI
defects from previous release 5 per module on S/800
.LI
no serious unresolved defects from previous release
.LI
completion of reviews for all the code that is to be reviewed on S/800
.LI
snapshot Design for Design Change metric on S/800.  To be performed
at each build during project.
.LE

.LI
Documentation
.DL
.LI
update IRS
.LE

.LE

.ul 1
R&D - CND
.AL
.LI
Product Functionality
.DL
.LI
full NFS functionality on S/800(as defined in ERS), this is for
user code
.LI
code will be good enough for ALPHA sites and possible early
releases for good business opportunities
.LI
have ALPHA releases
.LI
have 3.2 NFS functionality folded in
.LE

.LI
Meet performance goals

.LI
Documentation
.DL
.LI
update ERS
.LE

.LI
Test Equipment
.DL
.LI
all test machines and required software in place and operational
.LE

.LI
All QA metrics/tools/processes in place

.LI
Plan for integration with ITG release cycles for S/800

.LI
Actions with TWG   (With help from ISO and SSO)
.DL
.LI
have all man pages affected by NFS that need approval 
approved by TWG(with the appropriate pages going to the
Networking and HP-UX TWG's).
.LE

.LI
Reviews
.DL
.LI
preliminary Product Support Plan
.LE

.LE

.ul 1
Technical Documentation - CND
.AL
.LI
First drafts complete
.LI
Start coordination of manual usability testing as defined in the
documentation plan
.LE

.ul 1
Technical Support - CND
.AL
.LI
Final training plan complete and approved by PRSD (Product
Support Division)
.LI
Final product support plan written and approved by PRSD
.LI
Final trouble shooting guide written and approved by program team    
.LE

.PH " 'Lifecycle for Program NERFS/800' 'Midpoint in QA' "
.bp
.nr P 1
.ul 1
.H 1 "Midpoint in QA"

.ul 1
R&D - CND
.AL
.LI
Product Functionality
.DL
.LI
BETA release of NFS on and S/800.  Quality to be determined
by ??? number of major defects and ??? number of minor defects.
.LI
pass 24 hour reliability test and functional tests
.LE

.LI 
Confirm maintenance of our performance goals

.LI
Release and integration procedures to SIC are established for S/800

.LI
Plan for re-testing NFS with future releases of HP-UX
from ISO
.LE

.ul 1
Technical Documentation - CND
.AL
.LI
Second drafts complete
.DL
.LI
distribute to BETA sites
.LE
.LE

.ul 1
Technical Support - CND
.AL
.LI
Get feedback from ALPHA and BETA sites in order that it can
be incorporated into the product
.LI
Design of demo code
.LE


.PH " 'Lifecycle for Program NERFS/800' 'QA Complete' "
.bp
.nr P 1
.ul 1
.H 1 "QA Complete"
 - release to SIC (S/800 release group)

.ul 1
R&D - CND
.AL
.LI
Integration with release version of vnode kernel from ISO
.LI 
Confirm maintenance of our performance goals
.LI
Quality Assurance
.DL
.LI
no major defects present in final release
.LI
run 120 hours without any crash or serious defect
.LI
all system and functional tests executed and completed.  This will
include connectivity tests and performance characterizations.
.LI
80% code coverage
.LI
all documentation done for test suites
.LE
.LE

.ul 1
R&D - ISO/IND
.AL
.LI
Release version of vnode kernel for HP-UX
.LE

.ul 1
R&D - ISO
.AL
.LI
All NFS affected commands are tested and released to 
S/800 SIC cycles
.LE

.ul 1
Product Marketing - CND
.AL
.LI
Final reports from ALPHA and BETA sites
.LI
Payment to SUN for fully paid up perpetual license for NFS
.LI
Pricing approved
.LI
Introduction scheduled or in process
.LE

.ul 1
Technical Documentation - CND
.AL
.LI
Final drafts complete with enough lead time to be in stock by
Manufacturing Release (2 months)
.LI
Complete coordination of manual usability testing
.LE

.ul 1
Technical Support - CND
.AL
.LI
Initial version of demo code
.LE

.PH " 'Lifecycle for Program NERFS/800' 'Manufacturing Release ' "
.bp
.nr P 1
.ul 1
.H 1 "Manufacturing Release "

.ul 1
R&D - CND
.AL
.LI
All code in place with zero unresolved defects
.DL
.LI
there may be defects that due to NFS compatibility, will not be fixed
.LE
.LI
Build of system from "raw" source and regression tests
of that system
.LI
Receive complete system back from SIC
.DL
.LI
test installibility of NFS
.LI
check for introduced interactions into HP-UX
.LI
run regression and 20 reliability tests
.LE

.LI
Release Dinner Reservation
.LI
Post Mortem and final metrics
.LE

.ul 1
Technical Documentation - CND
.AL
.LI
Manuals in stock
.LI
Complete evaluation of documentation
.LE

.ul 1
Technical Support - CND
.AL
.LI
SE training
.LI
Final demo code
.LI
Installability test checkoff
.LI
Serviceability test checkoff
.LE


.PH " 'Lifecycle for Program NERFS/800' 'Active Product' "
.bp
.nr P 1
.ul 1
.H 1 "Active Product "

.ul 1
R&D - CND
.AL
.LI
Identification of CPE staff
.LI
Investigation of NFS follow on
.DL
.LI
update to new releases from SUN
.LE
.LE

.ul 1
Product Marketing - CND
.AL
.LI
Distribute customer feedback of NFS
.LE

.ul 1
Documentation
.AL
.LI
Update and revise documentation as necessary.
.LE

.TC